Road Construction

Bayreuth
ELECTRONIC INTERLOCKING Bayreuth

preliminary design
planning permission
tender documents
detailed design

– Planning for road crossings with bypass roads

ESTW Stolberg
ELECTRONIC INTERLOCKING Stolberg

preliminary design
planning permission
tender documents
detailed design

– Planning for road crossings with bypass roads

Signalling Systems

ESTW Zittau
ELECTRONIC INTERLOCKING Zittau

preliminary design
implementation planning
announcement

– PT1
– PT2

ESTW Erfurt
ELECTRONIC INTERLOCKING Erfurt

preliminary design
implementation planning

– PT1
– Adaption Visselbach

PZB Sofortprogramm
PZB Immediately Program

implementation planning

– PT1

Knoten Halle
Railway Station Halle

implementation planning

– ESTW-A Halle Nord, Halle-West, Halle-Ost,
Bz 3.300 ff
– old technology Stw Hp3, Hp4s, Hp5, Am

BÜ 0,7 Knoten Halle
BÜ 0,7 Knoten Halle

implementation planning

BÜSA Dresden-Klotzsche
BÜSA Dresden-Klotzsche

preliminary design
planning permission
detailed design

Wiesbaden-Igstadt
ESTW-R Wiesbaden-Igstadt

preliminary
preliminary design
implementation planning

– PT1 ESTW-R
– Adaptation Bf Niedernhausen
– Adaptation Wiesbaden Hbf
– ZN

Neustadt-Iphofen
Neustadt-Iphofen

preliminary design
planning permission

– 3 ESTW

Telecommunications Equiptment

ESTW Meerane
ELECTRONIC INTERLOCKING Meerane

implementation planning

– Alarm system (MAS) 90
– Fire alarm system
– Burglar alarm system
– transmission technology
– Fiber Optic Cable
– Distance telecommunication cables (Cu)

S-Bahn Berlin

preliminary design
implementation planning

– PA systems – Passenger information systems

Merseburg/Weißenfels

implementation planning

– Fiber Optic Cable
– Distance telecommunication cables (Cu)

GSM-R BTS Calbe
GSM-R BTS Calbe

draft planning

Rebind GSM-R base station calbe with fiber optic cable

HOA Demker
HOA Demker

preliminary design

– HOA
– FBOA

Grüner Bahnhof - Lutherstadt Wittenberg
Grüner Bahnhof – Lutherstadt Wittenberg

implementation planning
announcement

– PA systems
– Passenger information systems
– emergency call

Knappenrode - Horka
Knappenrode – Horka

implementation planning

– Alarm system (MAS) 90
– cable planning
– Fire alarm system
– Burglar alarm system
– transmission technology
– ZLV-Bus
– Operating telecommunications equipment

Electrical Systems 16.7 and 50 Hz

BOS Digital Radio Network S-Bahn Berlin

– implementation planning

– power supply for BOS Digital Radio Network

EEA Hohenstein
ELECTRONIC INTERLOCKING Hohenstein-Ernstthal-St. Egidien

preliminary design
planning permission

– Track field illumination

Biowerk Sohland

preliminary design
implementation planning

– track lighting

EEA BF Ampfing
Railway Station Ampfing

implementation planning

– Electrical Power Systems

ZBA Gremberg
ZBA Gremberg

implementation planning

– Track field illumination

Railway Station Guben

implementation planning

– Electrical Power Systems

ESTW Wiesbaden-Igstadt
ESTW Wiesbaden-Igstadt

preliminary design
implementation planning
announcement

– Electrical Power Systems

Project Management

ESTW Kronach
ELECTRONIC INTERLOCKING Kronach

– supervision
– LST

ESTW-A Zittau
ESTW-A Zittau

preliminary design
planning permission
detailed design
tender documents

– LST
– EEA
– TK
– Aufzug
– Tiefbau

ESTW Neustadt - Aisch-Iphofen
ESTW Neustadt / Aisch – Iphofen

preliminary design
planning permission

– OLA
– Oberbau
– LST
– TK
– EEA
– KTB

ESTW Wiesbaden-Igstadt
ESTW Wiesbaden-Igstadt

preliminary design
detailed design
tender documents

– LST
– EEA
– KTB